SCG-D
was initially hired by Providence Day School to form a conceptual
design for the renovation of the existing track and field at Overcash
Stadium and to provide a preliminary feasibility and cost analysis
based on the conceptual design.
SCG-D hosted a design charrette, formed the conceptual
plan and cost analysis, and presented the preliminary report to
PDS.
SCG-D
was then hired to provide the final design and permitting documents
for the full track with one paved D area and with field events
located in the track oval.
Additionally, throwing events were designed to be located
on property adjacent to the existing stadium.
A synthetic turf stadium field was designed to be located
within the track oval with a subsurface drainage system